Residential Grid Connected solar rooftop PV system
About | Information | History | Online | Facts | Discovery
The system is interfaced with the power utility grid. Here, Solar PV system takes the first priority to run the loads. The excess power, if generated will be exported to the power grid. In case of deficit of solar power, the differential power is drawn from the power grid. In this system, a bi-directional meter is installed to measure the net energy (Net metering). BESCOM or the power utility company in Bangalore (India) is currently paying 9.56 rupees for every unit of energy that is exported to the grid (On net metering basis)
Comments
-
hello sir,
plz tell me what is your daily generating capacity in units.
plz ans my question. -
those 8 250w panels connected all in series? or series to parallel? many thanks
-
i have one dought...does india have power utility grid?
-
superb
-
how you synchronized self generated ac power to grid to supply it to the grid.... ?
-
Sir,
1) What cost of 1 kv solar system.
2) what parts need for solar system. like solar panels, investor. n what.
3) how produce units by 1kv solar panels.
thanks a lot so much Sir. -
Is it possible to have a battery connected(May be parallel to the system) to a Grid connected Solar system, so that my battery charges along with the export of energy into the Grid? This might help in providing intermittent supply during night, in case of power cuts.
-
Very well explained
-
If the consumer sells electricity to the grid at 9.56 Indian Rupees then, how much does the consumer pay while buy electricity?
-
Sir , what kind of AC and DC distribution box are used for this purpose ?
-
is it possible to install that in ludhiana (punjab). also wats the cost of 2kw setup ?
-
is it possible to install that in ludhiana (punjab). also wats the cost of 2kw setup ?
-
is it possible to install that in ludhiana (punjab). also wats the cost of 2kw setup ?
-
is it possible to install that in ludhiana (punjab). also wats the cost of 2kw setup ?
-
How much did this 2kW system cost? Can you please share the detail breakout for each component?
-
Explained well. Please tell why there are two meters, when one bidirectional meter does the job for both import and export power is accurately calculated.
-
Sir, it was explained nicely.Is it possible to supply in the state of maharashtra if I want to install .What is the cost involved and what about the after sales service if at all required?
-
If there is a maintenance going on main line , then how we isolate the supply from solar.
-
Beautifully explained sir. Good one.
4m 54sLenght